Monolith Titan Data Centers
AI
Data CentersAI for Engineers
High-density AI and HPC capacity across five locations — with two power models: AI Green Biomass behind-the-meter power in Colusa, and standard BTM with Local Energy at the other campuses, built for the engineers who run serious GPU workloads.
Monolith Titan Data Centers is where power and compute meet: behind-the-meter power wired directly to dense GPU halls — anchored by the AI Green Niagara Ave campus in Colusa, powered by its on-site Biomass plant, and expanding across California, South Carolina, and Alabama with BTM power from local energy and gas companies. Capacity is phased: a real anchor building today, growing in step with power and demand.
Step inside
Walk the hall.
Monolith Titan rack rows up close — branded end panels, gold GPU trays, and the structured cabling that ties the hall together.